Pixii’s Battery Energy Storage System helps EV charging sites deliver more power without relying only on grid upgrades. Store energy when it is available, use it when demand is high, and build charging infrastructure that can grow over time.
From public charging for cars and light mobility to fleet depots and heavy-duty vehicles, Pixii enables smarter, more flexible, and more resilient EV charging.

EV charging demand is growing fast, and many sites need more power than the local grid can easily provide. Grid upgrades can be costly, slow, or difficult to justify before demand is fully established.
Pixii’s Battery Energy Storage System adds flexible local capacity to EV charging sites. Energy can be stored when demand is low, prices are favourable, or solar power is available, then used when charging demand peaks.
This helps operators increase charging performance, reduce grid pressure, control energy costs, and scale infrastructure as demand grows.

Steffen Ackmann, Sales Director EV Infrastructure, will answer your questions regarding your EV project needs.

Public charging must be convenient, reliable, and available where users need it – from car parks and retail sites to workplaces, hotels, transport hubs, and rural destinations.
Pixii PowerBase EV Mini, 224kW / 450kWh helps public charging sites deliver more usable power without depending only on grid reinforcement. Stored energy can support busy charging periods, improve site performance, and make better use of local solar generation.



For large scale public EV charging stations, trucks, vans, buses, and heavy-duty vehicles
Large scale charging creates concentrated power demand, especially when multiple vehicles return to base and charge at the same time. For trucks, buses, vans, and other heavy-duty vehicles, this can place major pressure on the grid connection.
Pixii PowerBase EV, 560kW / 1125kWh gives fleet sites a flexible energy buffer. Power can be stored gradually and used during peak charging windows, helping operators electrify more vehicles without immediately oversizing the grid connection.

Pixii’s modular BESS can be sized for today’s charging needs and expanded as demand grows. It supports peak shaving, energy shifting, solar optimisation, backup power, and flexibility services where available.
With Pixii, EV charging infrastructure becomes more than a power load – it becomes a flexible energy asset.